Highway Construction — Gordon, Georgia

WD GA20260178-16589-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Gordon, Georgia (construction type: highway) is $14.64/hr base + $1.98/hr fringe = $16.62/hr total package (WD GA20260178-16589-hwy, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: GA20260178-16589-hwy
Revision: 1
Construction Type: highway
State: Georgia (GA)
County: Gordon
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference GA20260178View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $14.64 $1.98 $16.62 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.89 $1.73 $16.62 -27% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.38 $1.47 $15.85 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $12.17 $1.82 $13.99 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $14.63 $0.00 $14.63 -47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.53 $0.00 $15.53 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT $13.50 $2.03 $15.53 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL $11.20 $1.02 $12.22 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $13.12 $0.00 $13.12 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.45 $0.00 $10.45 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.50 $0.00 $14.50 -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.64 $1.73 $17.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $13.71 $0.00 $13.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.03 $2.22 $17.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $13.31 $2.19 $15.50 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $18.74 $1.76 $20.50 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.35 $4.08 $25.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $17.24 $3.99 $21.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.87 $2.83 $20.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $15.82 $0.00 $15.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.69 $0.00 $14.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $16.88 $0.00 $16.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.95 $0.00 $15.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE GROUNDSMAN $14.50 $2.18 $16.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.81 $3.24 $20.05 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $20.34 $2.86 $23.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.75 $2.12 $15.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.16 $0.00 $13.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $15.23 $1.70 $16.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SHUTTLE BUGGY $13.61 $0.00 $13.61 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $13.46 $0.00 $13.46 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $13.20 $0.00 $13.20 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: LABORER $13.51 $0.83 $14.34 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.31 $0.27 $14.58 -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.42 $2.02 $17.44 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HYDROSEEDER TRUCK $11.23 $0.00 $11.23 Top 10% -59% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.42 $0.00 $17.42 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $16.99 $0.00 $16.99 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.82 $0.00 $12.82 -53% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Gordon, GA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Gordon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260178-16589-hwy →