Davis-Bacon Wage Determinations — Gordon, Georgia

Gordon has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Gordon, Georgia cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: GA20260091-16589-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: GA20260064-16589-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: GA20260178-16589-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: GA20260022-16589-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Gordon

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE building $52.81 $38.44 $91.25 WD →
2 BOILERMAKER building $34.21 $23.92 $58.13 WD →
3 PIPEFITTER building $38.98 $17.01 $55.99 WD →
4 OPERATOR: CRANE building $38.53 $16.08 $54.61 WD →
5 OPERATOR: Crane building $38.53 $16.08 $54.61 WD →
6 SHEET METAL WORKER building $24.89 $9.09 $33.98 WD →
7 SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.77 0.00 SHEET METAL WORKER building $24.89 $9.09 $33.98 WD →
8 ELECTRICIAN heavy $28.40 $0.52 $28.92 WD →
9 OPERATOR: GRADER/BLADE heavy $25.82 $1.81 $27.63 WD →
10 OPERATOR: Grader/Blade heavy $25.82 $1.81 $27.63 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →