Residential Construction — Sarasota, Florida

WD FL20260084-16540-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Sarasota, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260084-16540-res, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: FL20260084-16540-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Sarasota
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference FL20260084View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES CABINET INSTALLATION $16.10 $0.00 $16.10 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.02 $0.00 $17.02 -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $13.15 $0.00 $13.15 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $9.50 $0.22 $9.72 Bottom 10% $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $10.00 $0.00 $10.00 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.25 $0.00 $15.25 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $35.25 $17.32 $52.57 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.00 $0.00 $8.00 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $9.15 $0.00 $9.15 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.33 $0.00 $10.33 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.33 $0.00 $11.33 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $12.40 $0.00 $12.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $13.75 $0.00 $13.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.50 $2.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.00 $0.00 $14.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.17 $0.00 $12.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.62 $0.00 $10.62 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $14.81 $0.00 $14.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY $13.09 $0.00 $13.09 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $11.25 $0.00 $11.25 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.00 $0.00 $15.00 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION $12.43 $0.00 $12.43 -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $15.65 $0.00 $15.65 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION $9.85 $0.38 $10.23 -57% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.63 $3.00 $18.63 Bottom 10% -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND LOWBOY $10.63 $0.00 $10.63 -56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sarasota, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sarasota

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260084-16540-res →