Building Construction — Sarasota, Florida

WD FL20260225-16540-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Sarasota, Florida (construction type: building) is $30.12/hr base + $13.11/hr fringe = $43.23/hr total package (WD FL20260225-16540-bld, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: FL20260225-16540-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Sarasota
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference FL20260225View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.12 $13.11 $43.23 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.30 $0.00 $20.30 -12% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.85 $0.60 $15.45 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.11 $14.59 $47.70 +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.37 $12.65 $39.02 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.25 $17.32 $52.57 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING $12.83 $0.00 $12.83 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $1.40 $15.40 -22% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.07 $8.80 $30.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.00 $1.40 $15.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.72 $2.13 $16.85 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $51.83 $38.44 $90.27 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $20.59 $7.49 $28.08 Bottom 10% +16% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.14 $8.11 $29.25 +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $35.01 $16.85 $51.86 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.05 4.47 ROOFER $19.00 $1.17 $20.17 -15% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.86 $7.94 $29.80 +23% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.01 $0.00 $18.01 -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.22 $2.12 $15.34 -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sarasota, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sarasota

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260225-16540-bld →