Building Construction — Martin, Florida

WD FL20260214-16476-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Martin, Florida (construction type: building) is $39.76/hr base + $19.02/hr fringe = $58.78/hr total package (WD FL20260214-16476-bld, Rev. 1).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: FL20260214-16476-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Martin
Effective: May 17, 2026
Trades covered: 30
Official source: SAM.gov reference FL20260214View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $39.76 $19.02 $58.78 +153% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.49 $3.33 $20.82 -10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.06 $0.70 $13.76 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $15.20 $55.45 +117% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.25 $0.00 $18.25 -29% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.84 $15.72 $44.56 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.77 $0.00 $10.77 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.69 $0.00 $11.69 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.56 $1.34 $14.90 -24% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $27.00 $14.90 $41.90 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.57 $14.90 $52.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.38 $14.90 $54.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.40 $14.90 $55.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.07 $14.90 $51.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $26.75 $14.90 $41.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.00 $2.82 $18.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $37.07 $14.90 $51.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.53 $14.90 $42.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.53 $2.48 $17.01 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.66 $21.01 $57.67 +137% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $36.66 $21.01 $57.67 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.52 1.01 ROOFER $19.98 $4.77 $24.75 +5% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 +143% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.01 $0.00 $18.01 -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.22 $2.12 $15.34 -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Martin, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Martin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260214-16476-bld →