Residential Construction — Jackson, Florida

WD FL20260048-16518-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Jackson, Florida (construction type: residential) is $11.90/hr base + $0.00/hr fringe = $11.90/hr total package (WD FL20260048-16518-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: FL20260048-16518-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Jackson
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference FL20260048View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $11.90 $0.00 $11.90 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $10.09 $0.00 $10.09 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $10.89 $0.00 $10.89 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.00 $0.00 $9.00 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.46 $0.00 $9.46 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $13.92 $0.00 $13.92 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
PLUMBER $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, AND SHAKE & SHINGLE ROOFS $11.64 $0.00 $11.64 Above median -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND LOWBOY $11.40 $0.00 $11.40 Top 10% -53% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260048-16518-res →