Highway Construction — Jackson, Florida

WD FL20260283-16518-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Jackson, Florida (construction type: highway) is $17.63/hr base + $0.00/hr fringe = $17.63/hr total package (WD FL20260283-16518-hwy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: FL20260283-16518-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Jackson
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference FL20260283View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.63 $0.00 $17.63 -24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.19 $0.00 $16.19 -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.13 $3.31 $24.44 -4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $13.63 $0.00 $13.63 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.60 $0.00 $13.60 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.67 $0.00 $14.67 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.00 $0.70 $17.70 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.30 $0.00 $16.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.11 $0.00 $17.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.15 $0.00 $14.15 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.91 $0.00 $15.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.23 $0.00 $30.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.90 $0.00 $17.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.88 $0.00 $16.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $16.10 $0.68 $16.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $18.31 $2.22 $20.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.51 $0.00 $16.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.51 $0.00 $15.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $17.88 $0.00 $17.88 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $14.41 $0.00 $14.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $19.00 $0.00 $19.00 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.95 $0.00 $17.95 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $19.09 $0.91 $20.00 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PILOT CAR $15.05 $0.00 $15.05 Top 10% -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.87 $0.00 $17.87 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jackson, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jackson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260283-16518-hwy →