Residential Construction — Hernando, Florida
WD FL20260064-16533-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Hernando, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260064-16533-res, Rev. 1).
Scroll down for all 42 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | $20.00 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $12.97 | $1.97 | $14.94 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.00 | $0.00 | $15.00 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $18.27 | $0.00 | $18.27 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $15.00 | $0.00 | $15.00 Above median -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $11.98 | $0.00 | $11.98 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FENCE ERECTOR | $14.00 | $0.75 | $14.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $15.88 | $0.00 | $15.88 Bottom 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR: BATT AND BLOWN | $12.41 | $0.00 | $12.41 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | $15.25 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $35.25 | $17.32 | $52.57 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $14.53 | $0.00 | $14.53 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.25 | $0.00 | $9.25 -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $10.72 | $0.00 | $10.72 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.29 | $0.00 | $11.29 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.14 | $0.00 | $15.14 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 Bottom 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PAVER | $12.40 | $0.00 | $12.40 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.25 | $0.00 | $15.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $12.67 | $0.00 | $12.67 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.41 | $0.00 | $11.41 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.00 | $0.00 | $14.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $11.50 | $0.00 | $11.50 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $10.62 | $0.00 | $10.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $10.93 | $0.00 | $10.93 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $14.81 | $0.00 | $14.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY | $13.59 | $0.00 | $13.59 Top 10% -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $13.91 | $0.00 | $13.91 Bottom 10% -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $12.97 | $0.00 | $12.97 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% | $39.01 | $16.85 | $55.86 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS | $15.98 | $0.00 | $15.98 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 Top 10% -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $14.82 | $0.00 | $14.82 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $16.00 | $0.00 | $16.00 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 Above median -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Hernando, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Hernando, Florida.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.