Highway Construction — Hernando, Florida

WD FL20260250-16533-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Hernando, Florida (construction type: highway) is $24.96/hr base + $0.00/hr fringe = $24.96/hr total package (WD FL20260250-16533-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: FL20260250-16533-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Hernando
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference FL20260250View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $24.96 $0.00 $24.96 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.06 $0.00 $23.06 +3% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.02 $3.53 $27.55 +8% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $24.16 $0.00 $24.16 Bottom 10% -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.00 $0.86 $14.86 -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.83 $0.00 $13.83 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $17.21 $0.00 $17.21 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.24 $2.01 $22.25 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.08 $10.75 $30.83 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.22 $8.72 $30.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.46 $1.25 $24.71 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $33.61 $11.50 $45.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.52 $0.82 $20.34 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $25.19 $0.00 $25.19 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $31.12 $11.50 $42.62 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.02 $0.00 $25.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.85 $5.07 $24.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $27.61 $1.00 $28.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $19.68 $0.00 $19.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.08 $2.65 $25.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $22.98 $0.00 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $20.80 $3.27 $24.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.54 $0.00 $15.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $23.77 $0.00 $23.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.91 $0.66 $17.57 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $21.02 $0.00 $21.02 -5% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $15.86 $1.52 $17.38 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $23.46 $0.00 $23.46 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.60 $6.43 $25.03 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $20.00 $0.00 $20.00 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.15 $5.48 $25.63 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $16.55 $0.00 $16.55 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.27 $0.00 $18.27 Above median -24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hernando, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hernando

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260250-16533-hwy →