Highway Construction — Flagler, Florida

WD FL20260248-16471-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Flagler, Florida (construction type: highway) is $22.58/hr base + $0.00/hr fringe = $22.58/hr total package (WD FL20260248-16471-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: FL20260248-16471-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Flagler
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference FL20260248View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $22.58 $0.00 $22.58 -2% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.23 $1.36 $21.59 -3% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.08 $3.40 $27.48 +8% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $24.16 $0.00 $24.16 Bottom 10% -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.18 $0.00 $16.18 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.78 $0.92 $16.70 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $17.21 $0.00 $17.21 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $21.43 $3.75 $25.18 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.82 $3.19 $24.01 Above median +22% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.59 $0.00 $22.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.30 $0.00 $21.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $33.61 $11.50 $45.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $17.12 $0.00 $17.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.25 $1.57 $22.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $31.54 $0.00 $31.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.25 $0.00 $19.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.05 $1.99 $21.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $29.69 $0.00 $29.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $20.86 $1.95 $22.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.27 $1.13 $21.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $25.18 $0.00 $25.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $17.45 $0.00 $17.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.54 $0.00 $15.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $18.53 $0.00 $18.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.00 $0.68 $16.68 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $21.02 $0.00 $21.02 -5% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $15.92 $0.00 $15.92 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $21.50 $0.00 $21.50 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.68 $0.00 $16.68 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.46 $0.00 $19.46 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.76 $0.00 $20.76 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $16.55 $0.00 $16.55 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.27 $0.00 $18.27 Above median -24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Flagler, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Flagler

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260248-16471-hwy →