Building Construction — Flagler, Florida

WD FL20260232-16471-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Flagler, Florida (construction type: building) is $30.12/hr base + $13.11/hr fringe = $43.23/hr total package (WD FL20260232-16471-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: FL20260232-16471-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Flagler
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference FL20260232View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.12 $13.11 $43.23 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.92 $0.00 $17.92 -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.00 $0.00 $19.00 -15% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.02 $14.43 $45.45 +78% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.81 $11.58 $34.39 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $21.87 $0.00 $21.87 -15% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.61 $0.00 $11.61 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.00 $0.00 $12.00 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.00 $0.54 $15.54 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.80 $2.81 $20.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $36.00 $15.10 $51.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $23.25 $9.20 $32.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.30 $0.00 $16.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $32.05 $9.20 $41.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $23.50 $9.20 $32.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.54 $0.00 $13.54 -39% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $53.73 $38.44 $92.17 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $23.16 $10.34 $33.50 +38% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.60 $22.68 $64.28 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $16.59 $0.00 $16.59 -25% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $25.75 $16.92 $42.67 +80% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 +143% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $17.25 $1.74 $18.99 -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.95 $2.28 $15.23 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Flagler, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Flagler

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260232-16471-bld →