Highway Construction — New Castle, Delaware

WD DE20260005-16448-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in New Castle, Delaware (construction type: highway) is $50.06/hr base + $4.32/hr fringe = $54.38/hr total package (WD DE20260005-16448-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: DE20260005-16448-hwy
Revision: 1
Construction Type: highway
State: Delaware (DE)
County: New Castle
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference DE20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $50.06 $4.32 $54.38 +85% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.03 $5.25 $38.28 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.99 $0.00 $65.99 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $49.77 $3.37 $53.14 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $55.67 $0.00 $55.67 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.15 $16.50 $47.65 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $36.33 $3.50 $39.83 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $43.30 $1.66 $44.96 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $37.55 $16.19 $53.74 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $38.36 $4.31 $42.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $28.11 $11.18 $39.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $38.29 $11.15 $49.44 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.81 $31.38 $77.19 Above median +183% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $43.76 $30.77 $74.53 Above median +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $45.81 $31.38 $77.19 Top 10% +183% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $43.76 $30.77 $74.53 Top 10% +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.81 $31.38 $77.19 Top 10% +183% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: POUNDER $43.76 $30.77 $74.53 +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $43.40 $30.66 $74.06 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $37.49 $0.00 $37.49 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $29.31 $9.84 $39.15 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the New Castle, DE — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in New Castle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for DE20260005-16448-hwy →