Building Construction — New Castle, Delaware

WD DE20260008-16448-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in New Castle, Delaware (construction type: building) is $55.00/hr base + $35.48/hr fringe = $90.48/hr total package (WD DE20260008-16448-bld, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: DE20260008-16448-bld
Revision: 1
Construction Type: building
State: Delaware (DE)
County: New Castle
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference DE20260008View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $55.00 $35.48 $90.48 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.19 $27.98 $62.17 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $38.27 $25.34 $63.61 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $41.69 $27.28 $68.97 Top 10% +173% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.50 $35.93 $83.43 Top 10% +176% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $49.96 $37.56 $87.52 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING, AND STRUCTURAL THE FOLLOWING HOLIDAYS SHALL BE OBSERVED, AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR $41.10 $38.23 $79.33 +183% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.45 $25.70 $57.15 Above median +161% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER, COMMON OR GENERAL, JACK HAMMER, MASON TENDER - BRICK, PIPELAYER, SCAFFOLD BUILDER, TAMPER $29.45 $25.70 $55.15 +152% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $51.54 $39.26 $90.80 Top 10% +268% vs market $0.00 $0.00 $0.00 $0.00
MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS: NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN' $71.85 $38.44 $110.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.96 $0.00 $33.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $25.89 $0.00 $25.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $32.40 $18.27 $50.67 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $38.80 $0.91 $39.71 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION AND EXCLUDES INDUSTRIAL WORK FOOTNOTE A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,INDEPENDENCE DAY, THA $41.35 $38.19 $79.54 +157% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INDUSTRIAL FOOTNOTE A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,INDEPENDENCE DAY, THANKSGIVING DAY,LABOR DAY, CHRISTMAS DAY, AND GENERA $56.43 $43.35 $99.78 +223% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER: FIREPROOFER $38.37 $31.64 $70.01 $0.00 $0.00 $0.00 $0.00
PLUMBER $47.73 $18.40 $66.13 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS $48.73 $32.23 $80.96 +197% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $39.09 $30.77 $69.86 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS $27.98 $27.90 $55.88 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.63 $40.60 $74.23 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $38.02 $25.39 $63.41 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $46.47 $29.56 $76.03 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $35.40 $4.31 $39.71 +84% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $57.98 $1.11 $59.09 Above median +174% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the New Castle, DE — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in New Castle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for DE20260008-16448-bld →