Residential Construction — Mesa, Colorado

WD CO20260004-16417-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Mesa, Colorado (construction type: residential) is $41.91/hr base + $12.49/hr fringe = $54.40/hr total package (WD CO20260004-16417-res, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: CO20260004-16417-res
Revision: 1
Construction Type: residential
State: Colorado (CO)
County: Mesa
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference CO20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $41.91 $12.49 $54.40 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $16.36 $1.38 $17.74 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.80 $0.00 $16.80 -42% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.00 $0.00 $13.00 -53% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER/FRAMER $17.13 $2.63 $19.76 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.40 $16.06 $51.46 +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.96 $12.50 $44.46 +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $13.25 $45.00 +51% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.53 $16.30 $46.83 +57% vs market $0.00 $0.00 $0.00 $0.00
FORMBUILDER/FORMSETTER $12.78 $1.98 $14.76 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $37.26 $13.15 $50.41 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $8.86 $0.00 $8.86 -60% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: BRICK FINISHERS/TENDERS $11.25 $0.00 $11.25 Top 10% -50% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CONCRETE/MASON TENDERS $10.00 $0.00 $10.00 Top 10% -55% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.62 $3.39 $17.01 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $44.15 $22.43 $66.58 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $23.24 $5.35 $28.59 -7% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: & PIPEFITTERS $41.32 $16.01 $57.33 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS & PIPEFITTERS TRAVEL OR ZONE PAY: TRAVEL OR ZONE PAY SHALL APPLY TO PROJECTS OVER SEVENTY-FIVE MILES FROM THE INTERSECTION OF I-25 AND THE EL $41.40 $17.17 $58.57 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $12.98 $3.31 $16.29 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $34.05 $14.25 $48.30 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $16.50 $0.00 $16.50 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-FINISH $34.58 $14.25 $48.83 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-ROUGH $34.05 $14.25 $48.30 Bottom 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED RUBBER TIRES UNDER 5 TONS $33.62 $14.25 $47.87 Top 10% +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL INCLUDING PUPS 40 CUBIC YARDS AND TANDEM BOWLS AND OVER $34.41 $14.25 $48.66 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL UNDER 40 CUBIC YARDS $34.21 $14.25 $48.46 Bottom 10% +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: WATER WAGON $34.05 $14.25 $48.30 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS:(ROLLER: SELF-PROPELLED ALL TYPES OVER 5 TONS $34.05 $14.25 $48.30 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.73 $0.00 $14.73 -45% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.05 $22.65 $65.70 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: ALL OTHER WORK $17.30 $4.05 $21.35 Top 10% -23% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $18.47 $3.74 $22.21 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mesa, CO — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mesa

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CO20260004-16417-res →