Building Construction — Mesa, Colorado

WD CO20260025-16417-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Mesa, Colorado (construction type: building) is $21.96/hr base + $0.00/hr fringe = $21.96/hr total package (WD CO20260025-16417-bld, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: CO20260025-16417-bld
Revision: 1
Construction Type: building
State: Colorado (CO)
County: Mesa
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference CO20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $21.96 $0.00 $21.96 -28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.53 $0.00 $20.53 -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.44 $10.23 $31.67 Above median +8% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.63 $9.51 $35.14 +18% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $20.49 $3.85 $24.34 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $39.21 $12.50 $51.71 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.25 $0.00 $13.25 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $15.99 $0.00 $15.99 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $16.00 $0.00 $16.00 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.96 $3.68 $20.64 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.78 $5.78 $26.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.58 $2.42 $21.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $21.50 $0.00 $21.50 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $27.41 $11.56 $38.97 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $19.56 $2.05 $21.61 -11% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $24.26 $10.66 $34.92 +14% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION $45.40 $22.11 $67.51 +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.23 $21.68 $68.91 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $37.34 $15.20 $52.54 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.09 $15.20 $51.29 +73% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $16.18 $0.00 $16.18 -40% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.05 $22.65 $65.70 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.34 $0.00 $17.34 Above median -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mesa, CO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.