Heavy Construction — Miller, Arkansas

WD AR20260062-15369-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Miller, Arkansas (construction type: heavy) is $17.89/hr base + $3.27/hr fringe = $21.16/hr total package (WD AR20260062-15369-hvy, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: AR20260062-15369-hvy
Revision: 1
Construction Type: heavy
State: Arkansas (AR)
County: Miller
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference AR20260062View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $17.89 $3.27 $21.16 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.36 $0.00 $16.36 -26% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.88 $7.19 $30.07 +27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.00 $0.00 $11.00 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.16 $2.08 $16.24 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.09 $0.00 $17.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.32 $1.65 $17.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.21 $6.79 $31.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.43 $0.00 $15.43 $0.00 $0.00 $0.00 $0.00
PAINTER $18.00 $0.00 $18.00 -3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.13 $1.90 $16.03 -33% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Miller, AR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Miller

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260062-15369-hvy →