Davis-Bacon Wage Determinations — Miller, Arkansas

Miller has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Miller, Arkansas cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: AR20260038-15369-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: AR20260062-15369-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: AR20260174-15369-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: AR20260122-15369-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Miller

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 BOILERMAKER building $34.21 $23.92 $58.13 WD →
2 PIPEFITTER building $34.41 $15.70 $50.11 WD →
3 ELECTRICIAN building $28.94 $14.95 $43.89 WD →
4 SHEET METAL WORKER building $26.99 $15.67 $42.66 WD →
5 OPERATOR: Crane heavy $24.21 $6.79 $31.00 WD →
6 OPERATOR: CRANE heavy $24.21 $6.79 $31.00 WD →
7 PLUMBER building $23.23 $6.92 $30.15 WD →
8 PAINTER building $16.25 $10.42 $26.67 WD →
9 OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE building $23.17 $0.00 $23.17 WD →
10 OPERATOR: Backhoe/Excavator/Trackhoe building $23.17 $0.00 $23.17 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →