Residential Construction — Crittenden, Arkansas

WD AR20260113-14698-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Crittenden, Arkansas (construction type: residential) is $17.09/hr base + $0.00/hr fringe = $17.09/hr total package (WD AR20260113-14698-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: AR20260113-14698-res
Revision: 1
Construction Type: residential
State: Arkansas (AR)
County: Crittenden
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference AR20260113View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $17.09 $0.00 $17.09 Bottom 10% -26% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING $12.32 $0.00 $12.32 Top 10% -45% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.16 $0.00 $13.16 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.67 $0.00 $18.67 -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.43 $0.00 $8.43 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.33 $0.00 $9.33 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $9.00 $0.00 $9.00 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.65 $0.00 $9.65 -46% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $15.75 $0.00 $15.75 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.86 $0.00 $12.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.75 $0.00 $12.75 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.06 $0.00 $12.06 -35% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $14.56 $0.00 $14.56 -39% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.87 $0.00 $14.87 -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.15 $0.00 $11.15 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Crittenden, AR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Crittenden

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260113-14698-res →