Highway Construction — Crittenden, Arkansas

WD AR20260162-14698-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Crittenden, Arkansas (construction type: highway) is $20.06/hr base + $0.00/hr fringe = $20.06/hr total package (WD AR20260162-14698-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: AR20260162-14698-hwy
Revision: 1
Construction Type: highway
State: Arkansas (AR)
County: Crittenden
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference AR20260162View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $20.06 $0.00 $20.06 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.49 $0.00 $15.49 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION $20.40 $0.00 $20.40 Bottom 10% -14% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $13.74 $0.00 $13.74 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $21.75 $0.00 $21.75 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $14.22 $0.00 $14.22 -40% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.00 $0.00 $22.00 -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.68 $0.00 $14.68 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.04 $0.00 $11.04 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.65 $0.00 $12.65 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.38 $0.00 $12.38 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.56 $0.00 $14.56 -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $15.80 $0.00 $15.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.08 $0.00 $17.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.06 $0.00 $16.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.08 $0.00 $17.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.84 $0.00 $22.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $14.85 $0.00 $14.85 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $10.79 $0.00 $10.79 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.85 $0.00 $16.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.88 $0.00 $19.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $17.52 $0.00 $17.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $19.29 $0.00 $19.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $15.62 $0.00 $15.62 $0.00 $0.00 $0.00 $0.00
OPERATOR: POST DRIVER $16.97 $0.00 $16.97 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $19.31 $0.00 $19.31 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $16.54 $0.00 $16.54 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $10.87 $0.00 $10.87 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.52 $0.00 $10.52 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.00 $0.00 $12.00 -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $21.03 $0.00 $21.03 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.67 $0.00 $17.67 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $12.50 $0.00 $12.50 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $16.00 $0.00 $16.00 -33% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Crittenden, AR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Crittenden

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260162-14698-hwy →