Residential Construction — Pinal, Arizona
WD AZ20260010-16201-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H in Pinal, Arizona (construction type: residential) is $32.29/hr base + $9.97/hr fringe = $42.26/hr total package (WD AZ20260010-16201-res, Rev. 1).
Scroll down for all 29 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H | $32.29 | $9.97 | $42.26 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 18.16 0.00 ALARM INSTALLER, INCLUDES WIRING AND INSTALLATION | $13.91 | $0.00 | $13.91 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.78 | $9.17 | $37.95 Above median +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $15.00 | $0.58 | $15.58 Above median -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS | $15.45 | $0.01 | $15.46 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $14.37 | $0.00 | $14.37 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $13.45 | $0.00 | $13.45 Bottom 10% -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $14.13 | $0.00 | $14.13 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.00 | $19.91 | $52.91 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.18 | $0.00 | $10.18 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $16.83 | $0.45 | $17.28 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.77 | $0.00 | $12.77 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE/STONE | $11.00 | $0.00 | $11.00 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.00 | $0.00 | $13.00 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $18.29 | $0.00 | $18.29 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $24.67 | $0.00 | $24.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $16.17 | $0.00 | $16.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $20.75 | $0.00 | $20.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $16.24 | $1.42 | $17.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $19.20 | $1.52 | $20.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $22.63 | $0.00 | $22.63 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.89 | $0.00 | $12.89 Above median -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $20.14 | $4.08 | $24.22 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $34.49 | $12.57 | $47.06 Above median +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $13.67 | $0.00 | $13.67 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $17.73 | $0.00 | $17.73 Bottom 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.02 | $0.00 | $17.02 Above median -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $14.50 | $0.00 | $14.50 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Pinal, AZ — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Pinal, Arizona.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.