WD AZ20260010-16201-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H in Pinal, Arizona (construction type: residential) is $32.29/hr base + $9.97/hr fringe = $42.26/hr total package (WD AZ20260010-16201-res, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: AZ20260010-16201-res
Revision: 1
Construction Type: residential
State: Arizona (AZ)
County: Pinal
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference AZ20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H $32.29 $9.97 $42.26 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 18.16 0.00 ALARM INSTALLER, INCLUDES WIRING AND INSTALLATION $13.91 $0.00 $13.91 -47% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.78 $9.17 $37.95 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $15.00 $0.58 $15.58 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS $15.45 $0.01 $15.46 -46% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.37 $0.00 $14.37 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $13.45 $0.00 $13.45 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $14.13 $0.00 $14.13 -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.00 $19.91 $52.91 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.18 $0.00 $10.18 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $16.83 $0.45 $17.28 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.77 $0.00 $12.77 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE/STONE $11.00 $0.00 $11.00 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.00 $0.00 $13.00 -41% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $18.29 $0.00 $18.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $24.67 $0.00 $24.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $16.17 $0.00 $16.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.75 $0.00 $20.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.24 $1.42 $17.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $19.20 $1.52 $20.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $22.63 $0.00 $22.63 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.89 $0.00 $12.89 Above median -43% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $20.14 $4.08 $24.22 -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $34.49 $12.57 $47.06 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.67 $0.00 $13.67 -38% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $17.73 $0.00 $17.73 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.02 $0.00 $17.02 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $14.50 $0.00 $14.50 -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pinal, AZ — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pinal

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260010-16201-res →