Heavy Construction — Pinal, Arizona

WD AZ20260060-16201-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER: FORMWORK CONCRETE in Pinal, Arizona (construction type: heavy) is $31.98/hr base + $9.26/hr fringe = $41.24/hr total package (WD AZ20260060-16201-hvy, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: AZ20260060-16201-hvy
Revision: 1
Construction Type: heavy
State: Arizona (AZ)
County: Pinal
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference AZ20260060View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER: FORMWORK CONCRETE $31.98 $9.26 $41.24 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.00 $13.04 $46.04 +61% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: GROUNDPERSON $36.00 $16.88 $52.88 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LINE EQUIPMENT OPERATOR $46.56 $19.15 $65.71 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: LINEPERSON $62.08 $22.49 $84.57 Top 10% +196% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $29.91 $9.26 $39.17 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTOR $27.41 $9.26 $36.67 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL $27.41 $9.26 $36.67 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE SETTER $29.91 $9.26 $39.17 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $29.05 $9.26 $38.31 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $29.91 $9.26 $39.17 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $29.91 $9.26 $39.17 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: UTILITY/POTHOLING $29.05 $9.26 $38.31 +72% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER-STEAMFITTER $54.15 $19.80 $73.95 +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $32.29 $18.12 $50.41 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER $32.21 $0.00 $32.21 +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE/DERRICK $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $30.88 $9.26 $40.14 +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADE CHECKER $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL $31.98 $9.26 $41.24 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $32.29 $18.12 $50.41 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $37.67 $18.12 $55.79 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $32.29 $18.12 $50.41 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $31.84 $0.00 $31.84 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRENCHER $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $27.41 $9.26 $36.67 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HYDROVAC $35.56 $18.12 $53.68 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $35.56 $18.12 $53.68 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pinal, AZ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pinal

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260060-16201-hvy →