Heavy Construction — Apache, Arizona

WD AZ20260007-15845-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.5 in Apache, Arizona (construction type: heavy) is $33.00/hr base + $13.04/hr fringe = $46.04/hr total package (WD AZ20260007-15845-hvy, Rev. 2).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: AZ20260007-15845-hvy
Revision: 2
Construction Type: heavy
State: Arizona (AZ)
County: Apache
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference AZ20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.5 $33.00 $13.04 $46.04 Top 10% $0.00 $0.00 $0.00 $0.00
ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 TRUCK DRIVER GROUP 5- 6-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRI $27.80 $1.65 $29.45 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $36.07 $30.59 $66.66 +83% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER COCHISE AND SANTA CRUZ COUNTIES; AND THE AREA OF GRAHAM AND GREENLEE COUNTIES LOCATED EAST AND SOUTH OF THE SAN FRANCISCO RIVER TO THE GILA $32.74 $9.52 $42.26 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H $31.68 $8.90 $40.58 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.08 $12.74 $40.82 +56% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.78 $9.17 $37.95 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $43.79 $8.93 $52.72 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $45.17 $8.93 $54.10 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $48.29 $8.93 $57.22 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (APACHE COUNTY [SOUTH OF HIGHWAY 66]; ALL OF GILA COUNTY; NAVAJO COUNTY [SOUTH AND EAST OF BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK $36.50 $14.84 $51.34 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (COCONINO AND YAVAPAI COUNTIES; AND THE FOLLOWING PORTIONS OF COUNTIES: NAVAJO COUNTY; PINAL $30.30 $12.36 $42.66 Top 10% +49% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4 $33.00 $19.91 $52.91 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $25.47 $8.00 $33.47 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $27.38 $12.44 $39.82 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER APACHE, COCONINO,GILA, GREENLEE, LA PAZ, NAVAJO, AND YAVAPAI $48.40 $19.50 $67.90 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER COCHISE AND SANTA CRUZ $48.40 $19.50 $67.90 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER, CONDUCTOR, BR $27.04 $11.72 $38.76 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA $30.31 $11.72 $42.03 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE OPERATOR, SKIP LOADER, UNIVERSAL EQUIPMENT OPERATOR MULTIPLE-UNIT EARTH EQUIPMENT, TRACTOR OPERATOR, PNEUMATIC $32.42 $11.72 $44.14 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL. FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS $26.95 $1.65 $28.60 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1 $27.43 $1.65 $29.08 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF S $28.68 $1.65 $30.33 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 $29.47 $1.65 $31.12 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATO $31.39 $11.72 $43.11 Top 10% $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $40.61 $17.53 $58.14 Top 10% $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $28.49 $8.93 $37.42 Above median $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $25.37 $8.93 $34.30 $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $22.98 $8.93 $31.91 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Apache, AZ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Apache

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260007-15845-hvy →