Residential Construction — Houston, Alabama

WD AL20260045-15800-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Houston, Alabama (construction type: residential) is $11.75/hr base + $0.00/hr fringe = $11.75/hr total package (WD AL20260045-15800-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: AL20260045-15800-res
Revision: 1
Construction Type: residential
State: Alabama (AL)
County: Houston
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference AL20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $11.75 $0.00 $11.75 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK, AND BLOWN INSULATION $8.27 $0.00 $8.27 -64% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.00 $0.00 $8.00 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $9.00 $0.00 $9.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $8.13 $0.00 $8.13 -64% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $9.94 $0.00 $9.94 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $8.01 $0.00 $8.01 -65% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $10.75 $0.00 $10.75 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $8.00 $0.00 $8.00 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.36 $0.00 $7.36 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $7.25 $0.00 $7.25 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $7.88 $0.00 $7.88 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.50 $0.00 $9.50 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $11.45 $0.00 $11.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.60 $0.00 $12.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.45 $0.00 $10.45 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $9.33 $0.00 $9.33 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.83 $0.00 $10.83 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 9.86 0.00 ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS $10.65 $0.00 $10.65 -52% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Houston, AL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Houston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260045-15800-res →