Building Construction — Houston, Alabama

WD AL20260086-15800-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Houston, Alabama (construction type: building) is $31.10/hr base + $16.40/hr fringe = $47.50/hr total package (WD AL20260086-15800-bld, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: AL20260086-15800-bld
Revision: 1
Construction Type: building
State: Alabama (AL)
County: Houston
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference AL20260086View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.10 $16.40 $47.50 +109% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $34.21 $23.92 $58.13 +91% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $19.81 $0.00 $19.81 -16% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.00 $0.00 $15.00 -35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.48 $0.00 $16.48 -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.55 $4.24 $23.79 -6% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.86 $7.94 $30.80 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.75 $14.03 $47.78 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER $18.06 $8.00 $26.06 +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.00 $0.00 $11.00 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.16 $0.00 $12.16 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.58 $0.00 $12.58 -28% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.69 $0.00 $16.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.37 $0.00 $16.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $20.69 $0.00 $20.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.52 $0.89 $18.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.69 $0.00 $14.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.00 $1.78 $15.78 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $15.41 $0.00 $15.41 -30% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $14.31 $0.00 $14.31 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $20.78 $5.04 $25.82 +0% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.20 $13.51 $48.71 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $31.75 $14.55 $46.30 +105% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 16.85 10.94 ROOFER $13.61 $0.00 $13.61 -39% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $15.86 $0.00 $15.86 -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.18 $0.00 $13.18 -45% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Houston, AL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Houston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AL20260086-15800-bld →