Wage Determination WI20260036-17018-res

Fond Du Lac, WI · residential · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination WI20260036-17018-res covers 22 trade classifications for residential construction in Fond Du Lac, WI. Total packages (base + fringe) range from $31.66/hr to $80.80/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: WI20260036-17018-res
Revision: 2
Type: residential
County: Fond Du Lac
State: WI
Effective: May 17, 2026
Trades covered: 22
Highest rate: $80.80/hr
Official source: SAM.gov reference WI20260036View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $30.21 $22.26 $52.47 $0.00 $0.00 $0.00 $0.00
CARPENTER $40.79 $27.90 $68.69 $0.00 $0.00 $0.00 $0.00
CARPENTER (FOND DU LAC) $30.21 $22.26 $52.47 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.37 $7.29 $31.66 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.46 $33.34 $80.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.16 $25.82 $48.98 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.00 $14.97 $47.97 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; MASON TENDER - BRICK $23.90 $16.48 $40.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $24.95 $9.05 $34.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.70 $9.58 $35.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT $44.92 $27.35 $72.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT $45.67 $27.35 $73.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT..$ 44.62 27.35 OPERATOR: POWER EQUIPMENT $45.67 $27.35 $73.02 $0.00 $0.00 $0.00 $0.00
PLUMBER $52.24 $27.56 $79.80 $0.00 $0.00 $0.00 $0.00
PLUMBER $50.02 $23.29 $73.31 $0.00 $0.00 $0.00 $0.00
PLUMBER $41.29 $25.98 $67.27 $0.00 $0.00 $0.00 $0.00
ROOFER $33.84 $9.19 $43.03 $0.00 $0.00 $0.00 $0.00
ROOFER $33.73 $16.34 $50.07 $0.00 $0.00 $0.00 $0.00
ROOFER $45.12 $23.15 $68.27 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $31.06 $25.70 $56.76 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $28.78 $19.61 $48.39 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $27.92 $21.43 $49.35 $0.00 $0.00 $0.00 $0.00
View all WDs for Fond Du Lac → Revision history →