Wage Determination WI20260036-17018-res
Fond Du Lac, WI · residential · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination WI20260036-17018-res covers 22 trade classifications for residential construction in Fond Du Lac, WI. Total packages (base + fringe) range from $31.66/hr to $80.80/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: WI20260036-17018-res
Revision: 2
Type: residential
County: Fond Du Lac
State: WI
Effective: May 17, 2026
Trades covered: 22
Highest rate: $80.80/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $30.21 | $22.26 | $52.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $40.79 | $27.90 | $68.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (FOND DU LAC) | $30.21 | $22.26 | $52.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $24.37 | $7.29 | $31.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $47.46 | $33.34 | $80.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $23.16 | $25.82 | $48.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.00 | $14.97 | $47.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 | $34.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $25.70 | $9.58 | $35.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT | $44.92 | $27.35 | $72.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT | $45.67 | $27.35 | $73.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT..$ 44.62 27.35 OPERATOR: POWER EQUIPMENT | $45.67 | $27.35 | $73.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $52.24 | $27.56 | $79.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $50.02 | $23.29 | $73.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.29 | $25.98 | $67.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.84 | $9.19 | $43.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.73 | $16.34 | $50.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $45.12 | $23.15 | $68.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION | $31.06 | $25.70 | $56.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION | $28.78 | $19.61 | $48.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION | $27.92 | $21.43 | $49.35 | $0.00 | $0.00 | $0.00 | $0.00 |