Wage Determination WA20260029-16956-bld
Jefferson, WA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination WA20260029-16956-bld covers 30 trade classifications for building construction in Jefferson, WA. Total packages (base + fringe) range from $21.98/hr to $109.44/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: WA20260029-16956-bld
Revision: 1
Type: building
County: Jefferson
State: WA
Effective: May 17, 2026
Trades covered: 30
Highest rate: $109.44/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $75.37 | $18.82 | $94.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC | $59.88 | $27.57 | $87.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJE | $51.52 | $16.99 | $68.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $63.98 | $19.13 | $83.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| DOZER D-10 | $60.67 | $27.57 | $88.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $61.14 | $23.76 | $84.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $55.39 | $22.38 | $77.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $41.24 | $14.70 | $55.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $29.90 | $0.00 | $29.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $17.80 | $4.18 | $21.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $75.21 | $33.88 | $109.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM; EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS | $62.47 | $27.57 | $90.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM | $63.35 | $27.57 | $90.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS | $55.43 | $27.57 | $83.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RES | $50.38 | $16.96 | $67.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $44.50 | $16.45 | $60.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER | $35.00 | $0.00 | $35.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $42.01 | $20.20 | $62.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $44.13 | $26.40 | $70.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $49.70 | $18.62 | $68.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.50 | $6.87 | $30.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RA | $52.31 | $17.01 | $69.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| WITH ATTACHMENTS | $59.23 | $27.57 | $86.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS | $61.56 | $27.57 | $89.13 | $0.00 | $0.00 | $0.00 | $0.00 |