Wage Determination WA20260028-16959-bld

Island, WA · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination WA20260028-16959-bld covers 30 trade classifications for building construction in Island, WA. Total packages (base + fringe) range from $21.98/hr to $102.69/hr, with the highest going to SPRINKLER FITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: WA20260028-16959-bld
Revision: 1
Type: building
County: Island
State: WA
Effective: May 17, 2026
Trades covered: 30
Highest rate: $102.69/hr
Official source: SAM.gov reference WA20260028View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $75.37 $18.82 $94.19 $0.00 $0.00 $0.00 $0.00
BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC $59.88 $27.57 $87.45 $0.00 $0.00 $0.00 $0.00
BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJE $51.52 $16.99 $68.51 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $55.34 $20.05 $75.39 $0.00 $0.00 $0.00 $0.00
CARPENTER $63.98 $19.13 $83.11 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43 $0.00 $0.00 $0.00 $0.00
DOZER D-10 $60.67 $27.57 $88.24 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $53.59 $23.65 $77.24 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.20 $27.51 $80.71 $0.00 $0.00 $0.00 $0.00
GLAZIER $61.14 $23.76 $84.90 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.75 $4.23 $21.98 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $55.39 $22.38 $77.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.94 $0.00 $27.94 $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $17.80 $4.18 $21.98 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $60.72 $34.15 $94.87 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM; EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS $62.47 $27.57 $90.04 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM $63.35 $27.57 $90.92 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS $55.43 $27.57 $83.00 $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $52.31 $17.01 $69.32 $0.00 $0.00 $0.00 $0.00
ROOFER $44.50 $16.45 $60.95 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER $35.00 $0.00 $35.00 $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $66.05 $29.41 $95.46 $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $42.01 $20.20 $62.21 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $68.89 $33.80 $102.69 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $40.98 $18.17 $59.15 $0.00 $0.00 $0.00 $0.00
TILE SETTER $49.70 $18.62 $68.32 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.50 $6.87 $30.37 $0.00 $0.00 $0.00 $0.00
WITH ATTACHMENTS $59.23 $27.57 $86.80 $0.00 $0.00 $0.00 $0.00
WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS $61.56 $27.57 $89.13 $0.00 $0.00 $0.00 $0.00
View all WDs for Island → Revision history →