Wage Determination WA20260025-16971-bld
Garfield, WA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination WA20260025-16971-bld covers 26 trade classifications for building construction in Garfield, WA. Total packages (base + fringe) range from $16.91/hr to $100.11/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: WA20260025-16971-bld
Revision: 2
Type: building
County: Garfield
State: WA
Effective: May 17, 2026
Trades covered: 26
Highest rate: $100.11/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET AND VINYL | $42.01 | $20.20 | $62.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: A-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 | $57.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 | $54.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.91 | $0.00 | $16.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $25.53 | $0.00 | $25.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 | $49.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $65.20 | $34.91 | $100.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $35.00 | $0.00 | $35.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $38.56 | $23.40 | $61.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER | $39.31 | $23.40 | $62.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS | $39.51 | $23.40 | $62.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE; TRACKHOE/EXCAVATOR | $39.71 | $23.40 | $63.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE; TRACKHOE/EXCAVATOR; BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR; MECHANIC | $40.05 | $23.40 | $63.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE; TRACKHOE/EXCAVATOR LOADERS | $40.39 | $23.40 | $63.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 LOADERS | $42.36 | $23.40 | $65.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $35.75 | $14.40 | $50.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $50.00 | $28.41 | $78.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $44.30 | $28.58 | $72.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $29.86 | $13.95 | $43.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.50 | $6.87 | $30.37 | $0.00 | $0.00 | $0.00 | $0.00 |