Wage Determination VT20260026-17765-bld

Franklin, VT · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination VT20260026-17765-bld covers 17 trade classifications for building construction in Franklin, VT. Total packages (base + fringe) range from $14.81/hr to $59.77/hr, with the highest going to IRONWORKER, STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: VT20260026-17765-bld
Revision: 1
Type: building
County: Franklin
State: VT
Effective: May 17, 2026
Trades covered: 17
Highest rate: $59.77/hr
Official source: SAM.gov reference VT20260026View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $25.89 $0.78 $26.67 $0.00 $0.00 $0.00 $0.00
CARPENTER $17.15 $1.63 $18.78 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $20.69 $17.39 $38.08 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.90 $10.95 $42.85 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $33.65 $26.12 $59.77 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.88 $3.52 $16.40 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $15.78 $0.48 $16.26 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $16.50 $0.00 $16.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.00 $0.00 $19.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $16.40 $0.00 $16.40 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $17.91 $0.00 $17.91 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $17.91 $0.00 $17.91 $0.00 $0.00 $0.00 $0.00
PLUMBER $37.40 $19.02 $56.42 $0.00 $0.00 $0.00 $0.00
ROOFER $18.98 $4.40 $23.38 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.75 $18.63 $55.38 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $19.43 $2.30 $21.73 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.00 $0.81 $14.81 $0.00 $0.00 $0.00 $0.00
View all WDs for Franklin → Revision history →