Wage Determination VT20260016-17780-bld

Addison, VT · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination VT20260016-17780-bld covers 14 trade classifications for building construction in Addison, VT. Total packages (base + fringe) range from $16.00/hr to $59.77/hr, with the highest going to IRONWORKER, REINFORCING. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: VT20260016-17780-bld
Revision: 1
Type: building
County: Addison
State: VT
Effective: May 17, 2026
Trades covered: 14
Highest rate: $59.77/hr
Official source: SAM.gov reference VT20260016View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $30.56 $19.79 $50.35 $0.00 $0.00 $0.00 $0.00
CARPENTER $23.00 $5.94 $28.94 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING $18.81 $7.96 $26.77 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.53 $9.36 $30.89 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $33.65 $26.12 $59.77 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.66 $2.34 $16.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.50 $6.08 $25.58 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $16.11 $4.14 $20.25 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.11 $4.14 $20.25 $0.00 $0.00 $0.00 $0.00
PLUMBER $25.35 $5.79 $31.14 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $24.04 $8.25 $32.29 $0.00 $0.00 $0.00 $0.00
ROOFER $16.80 $0.00 $16.80 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $36.75 $18.63 $55.38 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $22.50 $6.08 $28.58 $0.00 $0.00 $0.00 $0.00
View all WDs for Addison → Revision history →