Wage Determination VA20260206-16914-hvy
Sussex, VA · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination VA20260206-16914-hvy covers 13 trade classifications for heavy construction in Sussex, VA. Total packages (base + fringe) range from $12.50/hr to $66.36/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: VA20260206-16914-hvy
Revision: 1
Type: heavy
County: Sussex
State: VA
Effective: May 17, 2026
Trades covered: 13
Highest rate: $66.36/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $22.74 | $7.82 | $30.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.29 | $4.41 | $24.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.85 | $14.13 | $50.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $31.00 | $18.28 | $49.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.61 | $0.00 | $14.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.96 | $4.68 | $20.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $0.00 | $20.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.37 | $3.83 | $25.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $25.18 | $15.15 | $40.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.93 | $6.87 | $23.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $39.99 | $18.05 | $58.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.50 | $0.00 | $12.50 | $0.00 | $0.00 | $0.00 | $0.00 |