Wage Determination VA20260204-16878-hvy
York, VA · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination VA20260204-16878-hvy covers 14 trade classifications for heavy construction in York, VA. Total packages (base + fringe) range from $14.92/hr to $66.36/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: VA20260204-16878-hvy
Revision: 1
Type: heavy
County: York
State: VA
Effective: May 17, 2026
Trades covered: 14
Highest rate: $66.36/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $22.74 | $7.82 | $30.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.85 | $5.15 | $26.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.85 | $14.13 | $50.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $31.00 | $18.28 | $49.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.92 | $0.00 | $14.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.98 | $4.82 | $20.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.67 | $15.75 | $37.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.37 | $3.83 | $25.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $25.18 | $15.15 | $40.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.03 | $6.99 | $24.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOAT OPERATOR | $41.99 | $18.05 | $60.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $39.99 | $18.05 | $58.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.92 | $3.15 | $21.07 | $0.00 | $0.00 | $0.00 | $0.00 |