Wage Determination VA20260172-16932-bld
Franklin, VA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination VA20260172-16932-bld covers 24 trade classifications for building construction in Franklin, VA. Total packages (base + fringe) range from $14.59/hr to $66.36/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: VA20260172-16932-bld
Revision: 1
Type: building
County: Franklin
State: VA
Effective: May 17, 2026
Trades covered: 24
Highest rate: $66.36/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA | $40.77 | $20.17 | $60.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $23.87 | $6.81 | $30.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $13.49 | $1.10 | $14.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $21.78 | $9.31 | $31.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL AND STRUCTURAL | $37.86 | $25.86 | $63.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $25.36 | $6.68 | $32.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING MASON TENDER - BRICK AND CEMENT, AND PIPELAYING | $15.15 | $1.58 | $16.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.24 | $0.87 | $17.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $20.01 | $0.00 | $20.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY ONLY | $29.16 | $11.86 | $41.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $24.98 | $9.14 | $34.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $21.15 | $3.92 | $25.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.99 | $18.05 | $58.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $40.99 | $18.05 | $59.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 18.38 3.30 ROOFER | $16.17 | $3.73 | $19.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $27.80 | $10.25 | $38.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.58 | $1.73 | $18.31 | $0.00 | $0.00 | $0.00 | $0.00 |