Wage Determination VA20260167-16876-bld
Virginia Beach*, VA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination VA20260167-16876-bld covers 32 trade classifications for building construction in Virginia Beach*, VA. Total packages (base + fringe) range from $13.86/hr to $90.50/hr, with the highest going to RATE FOR ALL HOURS WORKED. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: VA20260167-16876-bld
Revision: 2
Type: building
County: Virginia Beach*
State: VA
Effective: May 17, 2026
Trades covered: 32
Highest rate: $90.50/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA | $40.77 | $20.17 | $60.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $17.93 | $4.41 | $22.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAULKER | $18.49 | $1.33 | $19.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.13 | $0.00 | $17.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION | $22.94 | $1.94 | $24.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $19.36 | $4.68 | $24.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $27.18 | $4.13 | $31.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, RIGGER | $30.22 | $17.56 | $47.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 | $49.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING DEMOLITION | $12.90 | $0.96 | $13.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.48 | $3.27 | $16.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 | $3.12 | $16.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.40 | $1.96 | $14.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.25 | $2.72 | $21.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $18.07 | $3.50 | $21.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.00 | $0.00 | $18.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $18.10 | $5.43 | $23.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $36.92 | $18.25 | $55.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $36.92 | $18.25 | $55.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.99 | $18.05 | $58.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $40.99 | $18.05 | $59.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| RATE FOR ALL HOURS WORKED | $52.06 | $38.44 | $90.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.24 2.80 ROOFER | $17.50 | $2.20 | $19.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $18.91 | $4.67 | $23.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $27.80 | $10.25 | $38.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.50 | $0.75 | $16.25 | $0.00 | $0.00 | $0.00 | $0.00 |