Wage Determination VA20260126-16896-hwy

Henrico, VA · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination VA20260126-16896-hwy covers 34 trade classifications for highway construction in Henrico, VA. Total packages (base + fringe) range from $12.89/hr to $50.98/hr, with the highest going to ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: VA20260126-16896-hwy
Revision: 1
Type: highway
County: Henrico
State: VA
Effective: May 17, 2026
Trades covered: 34
Highest rate: $50.98/hr
Official source: SAM.gov reference VA20260126View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $19.22 $0.00 $19.22 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION $36.85 $14.13 $50.98 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.80 $0.00 $20.80 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $27.38 $0.00 $27.38 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $19.21 $2.82 $22.03 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.74 $2.05 $17.79 $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.88 $0.00 $14.88 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.76 $0.00 $17.76 $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $15.69 $0.00 $15.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR $19.09 $1.81 $20.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.61 $2.53 $20.14 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.16 $4.45 $23.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $17.40 $2.01 $19.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY $18.22 $2.69 $20.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.42 $4.69 $29.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $24.66 $0.00 $24.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $19.26 $0.00 $19.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $23.21 $0.00 $23.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $16.64 $0.00 $16.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.17 $0.00 $17.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $21.43 $0.00 $21.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $23.12 $3.60 $26.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.44 $3.83 $24.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $21.83 $4.08 $25.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.05 $1.29 $20.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $21.69 $0.00 $21.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $22.13 $4.89 $27.02 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.89 $0.00 $12.89 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER : HEAVY 7CY & UNDER $15.53 $0.00 $15.53 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK $16.48 $3.64 $20.12 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE $18.25 $0.00 $18.25 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HEAVY OVER 7 CY $16.98 $0.00 $16.98 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MULTI AXLE $17.94 $0.00 $17.94 $0.00 $0.00 $0.00 $0.00
View all WDs for Henrico → Revision history →