Wage Determination VA20260024-16920-hvy
Bath, VA · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination VA20260024-16920-hvy covers 13 trade classifications for heavy construction in Bath, VA. Total packages (base + fringe) range from $10.22/hr to $39.34/hr, with the highest going to POWER EQUIPMENT OPERATOR: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: VA20260024-16920-hvy
Revision: 1
Type: heavy
County: Bath
State: VA
Effective: May 17, 2026
Trades covered: 13
Highest rate: $39.34/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $12.69 | $1.18 | $13.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.50 | $1.44 | $16.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $21.92 | $3.34 | $25.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS COMMON OR GENERAL | $11.12 | $0.72 | $11.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS FLAGGER | $10.22 | $0.00 | $10.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS PIPELAYER | $13.74 | $4.71 | $18.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR : BACKHOE | $25.37 | $0.00 | $25.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR : BULLDOZER | $25.37 | $0.00 | $25.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR : EXCAVATOR | $16.01 | $1.54 | $17.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR : LOADER | $18.14 | $1.59 | $19.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $29.08 | $10.26 | $39.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.08 | $1.37 | $16.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $23.26 | $0.00 | $23.26 | $0.00 | $0.00 | $0.00 | $0.00 |