Wage Determination UT20260105-17761-hwy

Cache, UT · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination UT20260105-17761-hwy covers 29 trade classifications for highway construction in Cache, UT. Total packages (base + fringe) range from $19.85/hr to $59.00/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: UT20260105-17761-hwy
Revision: 1
Type: highway
County: Cache
State: UT
Effective: May 17, 2026
Trades covered: 29
Highest rate: $59.00/hr
Official source: SAM.gov reference UT20260105View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $21.87 $2.80 $24.67 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.24 $6.20 $26.44 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.23 $17.77 $59.00 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $19.52 $1.62 $21.14 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $13.76 $40.37 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $22.08 $8.65 $30.73 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.51 $5.84 $23.35 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.77 $4.08 $19.85 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.67 $3.54 $20.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.04 $7.27 $27.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.43 $3.31 $21.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $22.12 $8.72 $30.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $20.03 $6.55 $26.58 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.43 $11.60 $38.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.63 $11.88 $34.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $31.00 $15.65 $46.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $20.68 $6.84 $27.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.18 $9.73 $31.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $25.63 $10.53 $36.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.67 $9.13 $31.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $21.34 $9.59 $30.93 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $24.77 $12.40 $37.17 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $23.26 $11.47 $34.73 $0.00 $0.00 $0.00 $0.00
View all WDs for Cache → Revision history →