Wage Determination UT20260096-17786-hvy
Box Elder, UT · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination UT20260096-17786-hvy covers 10 trade classifications for heavy construction in Box Elder, UT. Total packages (base + fringe) range from $16.64/hr to $58.89/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: UT20260096-17786-hvy
Revision: 1
Type: heavy
County: Box Elder
State: UT
Effective: May 17, 2026
Trades covered: 10
Highest rate: $58.89/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $19.69 | $1.17 | $20.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $20.39 | $3.29 | $23.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $14.68 | $1.96 | $16.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.61 | $5.17 | $29.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.29 | $0.00 | $25.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $24.02 | $5.67 | $29.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $33.04 | $16.09 | $49.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL | $23.71 | $9.78 | $33.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $29.67 | $14.65 | $44.32 | $0.00 | $0.00 | $0.00 | $0.00 |