Wage Determination UT20260088-17762-bld
Washington, UT · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination UT20260088-17762-bld covers 22 trade classifications for building construction in Washington, UT. Total packages (base + fringe) range from $9.50/hr to $61.93/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: UT20260088-17762-bld
Revision: 1
Type: building
County: Washington
State: UT
Effective: May 17, 2026
Trades covered: 22
Highest rate: $61.93/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $22.13 | $1.67 | $23.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.51 | $5.18 | $24.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.57 | $0.00 | $19.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR - MECHANICAL | $15.28 | $1.65 | $16.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $14.48 | $0.00 | $14.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: IRRIGATION | $9.50 | $0.00 | $9.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.79 | $0.00 | $14.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 | $16.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $19.34 | $0.00 | $19.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $26.00 | $8.78 | $34.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $46.10 | $15.83 | $61.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $27.38 | $11.79 | $39.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.62 | $0.00 | $15.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $46.79 | $14.89 | $61.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $13.54 | $0.00 | $13.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $23.00 | $0.00 | $23.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.49 | $0.00 | $16.49 | $0.00 | $0.00 | $0.00 | $0.00 |