Wage Determination UT20260011-17666-hvy

Summit, UT · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination UT20260011-17666-hvy covers 33 trade classifications for heavy construction in Summit, UT. Total packages (base + fringe) range from $7.25/hr to $80.04/hr, with the highest going to LINE CONSTRUCTION: LINEMAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: UT20260011-17666-hvy
Revision: 1
Type: heavy
County: Summit
State: UT
Effective: May 17, 2026
Trades covered: 33
Highest rate: $80.04/hr
Official source: SAM.gov reference UT20260011View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.63 $0.97 $15.60 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.08 $3.14 $20.22 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.74 $7.64 $31.38 $0.00 $0.00 $0.00 $0.00
IRONWORKER $32.68 $27.55 $60.23 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER, HAND HELD SAW, JACKHAMMER, POWER SAW) $20.85 $8.65 $29.50 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 $0.00 $0.00 $0.00 $0.00
LABORER:FLAGGER $20.59 $8.65 $29.24 $0.00 $0.00 $0.00 $0.00
LABORER:HAND HELD DRILL $21.65 $8.65 $30.30 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $58.83 $21.21 $80.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.97 $9.40 $38.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT ( ROLLER) $34.25 $18.62 $52.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT (BLADE/GRADER) $40.32 $18.62 $58.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT SCREED $36.55 $18.62 $55.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT PAVER, BULLDOZER, FRONT END LOADER, GRADE SETTER, OIL DISTRIBUTOR, SCRAPER $37.79 $18.62 $56.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER, OILER $36.55 $18.62 $55.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR, FRONT END LOADER $39.01 $18.62 $57.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT:MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION $41.71 $18.62 $60.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $19.98 $0.00 $19.98 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.40 $3.99 $18.39 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 1 $41.39 $15.10 $56.49 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 2 $40.75 $15.10 $55.85 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 3 $40.37 $15.10 $55.47 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 1 $46.65 $15.75 $62.40 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 2 $46.02 $15.75 $61.77 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 3 $41.90 $15.75 $57.65 $0.00 $0.00 $0.00 $0.00
WATER & SEWER LINES: LABORER, COMMON OR GENERAL $12.81 $0.00 $12.81 $0.00 $0.00 $0.00 $0.00
WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE $15.57 $0.00 $15.57 $0.00 $0.00 $0.00 $0.00
View all WDs for Summit → Revision history →