Wage Determination TX20260053-14820-hvy
Orange, TX · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination TX20260053-14820-hvy covers 15 trade classifications for heavy construction in Orange, TX. Total packages (base + fringe) range from $7.41/hr to $47.32/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: TX20260053-14820-hvy
Revision: 1
Type: heavy
County: Orange
State: TX
Effective: May 17, 2026
Trades covered: 15
Highest rate: $47.32/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTERS | $13.15 | $0.00 | $13.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: ALL OTHER WORK | $13.56 | $0.00 | $13.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| CONCRETE FINISHER | $13.50 | $0.00 | $13.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.76 | $13.56 | $47.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS | $8.29 | $0.00 | $8.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS | $7.41 | $0.00 | $7.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $12.07 | $0.00 | $12.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $13.65 | $0.00 | $13.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $18.28 | $4.69 | $22.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS | $15.55 | $1.89 | $17.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: CRANE | $13.77 | $0.00 | $13.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $10.63 | $0.00 | $10.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: TRACKHOE | $15.60 | $0.00 | $15.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: DUMP | $10.00 | $0.00 | $10.00 | $0.00 | $0.00 | $0.00 | $0.00 |