Wage Determination TN20260191-14780-bld
Washington, TN · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination TN20260191-14780-bld covers 31 trade classifications for building construction in Washington, TN. Total packages (base + fringe) range from $12.73/hr to $56.99/hr, with the highest going to ASBESTOS WORKER/HEAT & FROST INSULATOR. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: TN20260191-14780-bld
Revision: 1
Type: building
County: Washington
State: TN
Effective: May 17, 2026
Trades covered: 31
Highest rate: $56.99/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $16.20 | $1.52 | $17.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.67 | $4.11 | $26.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $17.93 | $0.00 | $17.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $18.24 | $0.57 | $18.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $17.77 | $0.00 | $17.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.02 | $52.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GRADE CHECKER | $13.01 | $0.00 | $13.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $12.73 | $0.00 | $12.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.54 | $0.00 | $13.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $0.00 | $13.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $21.45 | $8.06 | $29.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.17 | $0.00 | $21.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $28.49 | $9.73 | $38.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $26.50 | $4.76 | $31.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $14.70 | $0.00 | $14.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $19.31 | $10.15 | $29.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $36.00 | $17.02 | $53.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $21.63 | $7.16 | $28.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $36.25 | $13.40 | $49.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $37.70 | $17.40 | $55.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC UNIT INSTALLATION.$ 22.87 6.58 ROOFER | $16.29 | $0.00 | $16.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $19.65 | $0.00 | $19.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |