Wage Determination SD20260011-17110-bld
Codington, SD · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination SD20260011-17110-bld covers 18 trade classifications for building construction in Codington, SD. Total packages (base + fringe) range from $13.47/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: SD20260011-17110-bld
Revision: 2
Type: building
County: Codington
State: SD
Effective: May 17, 2026
Trades covered: 18
Highest rate: $94.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | $34.08 | $18.71 | $52.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $55.34 | $34.03 | $89.37 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $31.88 | $1.83 | $33.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.34 | $17.15 | $53.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.28 | $3.37 | $20.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $33.01 | $15.08 | $48.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.32 | $16.83 | $53.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.73 | $1.74 | $13.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $14.19 | $0.00 | $14.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.00 | $19.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | $0.00 | $16.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $19.22 | $0.00 | $19.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $19.02 | $5.20 | $24.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR ( TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE | $34.38 | $18.71 | $53.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $14.52 | $2.09 | $16.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $30.93 | $17.22 | $48.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | $0.00 | $0.00 | $0.00 | $0.00 |