Wage Determination SC20260049-14614-hvy

Dorchester, SC · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination SC20260049-14614-hvy covers 9 trade classifications for heavy construction in Dorchester, SC. Total packages (base + fringe) range from $12.48/hr to $50.19/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: SC20260049-14614-hvy
Revision: 1
Type: heavy
County: Dorchester
State: SC
Effective: May 17, 2026
Trades covered: 9
Highest rate: $50.19/hr
Official source: SAM.gov reference SC20260049View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.85 $0.00 $14.85 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.75 $18.00 $47.75 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.64 $2.53 $14.17 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.55 $1.82 $14.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.54 $2.20 $17.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.11 $1.39 $21.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.50 $1.98 $12.48 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.00 $14.19 $50.19 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.65 $2.79 $18.44 $0.00 $0.00 $0.00 $0.00
View all WDs for Dorchester → Revision history →