Wage Determination SC20260010-14619-bld
Clarendon, SC · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination SC20260010-14619-bld covers 11 trade classifications for building construction in Clarendon, SC. Total packages (base + fringe) range from $10.52/hr to $24.52/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: SC20260010-14619-bld
Revision: 1
Type: building
County: Clarendon
State: SC
Effective: May 17, 2026
Trades covered: 11
Highest rate: $24.52/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | $14.46 | $0.78 | $15.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $15.00 | $0.00 | $15.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $14.23 | $0.00 | $14.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.76 | $0.76 | $10.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.62 | $1.46 | $14.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.17 | $1.76 | $17.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.55 | $1.20 | $14.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $19.58 | $4.94 | $24.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $16.99 | $2.17 | $19.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $12.76 | $2.04 | $14.80 | $0.00 | $0.00 | $0.00 | $0.00 |