Wage Determination PR20260029-17941-res
Dorado, PR · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination PR20260029-17941-res covers 9 trade classifications for residential construction in Dorado, PR. Total packages (base + fringe) range from $8.40/hr to $12.55/hr, with the highest going to OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PR20260029-17941-res
Revision: 1
Type: residential
County: Dorado
State: PR
Effective: May 17, 2026
Trades covered: 9
Highest rate: $12.55/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $8.90 | $0.00 | $8.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $9.04 | $0.00 | $9.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $10.57 | $0.64 | $11.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.83 | $0.65 | $8.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $12.00 | $0.55 | $12.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $8.40 | $0.00 | $8.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $9.94 | $0.56 | $10.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $9.05 | $0.94 | $9.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $11.50 | $0.53 | $12.03 | $0.00 | $0.00 | $0.00 | $0.00 |