Wage Determination PA20260107-14606-bld
York, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260107-14606-bld covers 45 trade classifications for building construction in York, PA. Total packages (base + fringe) range from $15.01/hr to $97.14/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260107-14606-bld
Revision: 2
Type: building
County: York
State: PA
Effective: May 17, 2026
Trades covered: 45
Highest rate: $97.14/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL | $40.00 | $29.81 | $69.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $33.99 | $16.87 | $50.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.84 | $20.19 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $37.73 | $4.59 | $42.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.23 | $8.13 | $31.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $58.70 | $38.44 | $97.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.31 | $23.93 | $64.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET ONLY | $18.78 | $5.02 | $23.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $26.91 | $11.88 | $38.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: VINYL FLOORING ONLY | $24.67 | $11.22 | $35.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $20.19 | $6.92 | $27.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $30.80 | $22.58 | $53.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $26.37 | $17.18 | $43.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (ASBESTOS ABATEMENT) | $27.47 | $19.89 | $47.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (COMMON OR GENERAL; CONCRETE WORKER; CONCRETE SAW) | $23.01 | $17.18 | $40.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $27.87 | $17.18 | $45.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $15.01 | $0.00 | $15.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.47 | $12.66 | $39.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $37.85 | $22.72 | $60.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $25.58 | $17.07 | $42.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $27.05 | $14.52 | $41.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $30.39 | $15.05 | $45.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $30.39 | $13.72 | $44.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $26.98 | $15.65 | $42.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $25.84 | $16.30 | $42.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $36.87 | $20.49 | $57.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $27.75 | $14.46 | $42.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $32.25 | $21.32 | $53.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.42 | $29.30 | $68.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (BOBCAT/SKID STEER/SKID LOADER; HOIST; FORKLIFT) | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) | $41.88 | $30.03 | $71.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.89 | $30.92 | $75.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, EXCLUDES WATERPROOFING | $24.10 | $13.47 | $37.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 | $85.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $28.96 | $78.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $20.65 | $8.24 | $28.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $24.87 | $10.14 | $35.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $29.65 | $6.84 | $36.49 | $0.00 | $0.00 | $0.00 | $0.00 |