Wage Determination PA20260092-14538-bld
Lancaster, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260092-14538-bld covers 50 trade classifications for building construction in Lancaster, PA. Total packages (base + fringe) range from $10.04/hr to $97.14/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260092-14538-bld
Revision: 2
Type: building
County: Lancaster
State: PA
Effective: May 17, 2026
Trades covered: 50
Highest rate: $97.14/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL | $40.00 | $29.81 | $69.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $33.99 | $16.87 | $50.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.84 | $20.19 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $37.73 | $4.59 | $42.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORM WORK, AND SCAFFOLD BUILDING | $25.71 | $10.17 | $35.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $35.46 | $5.50 | $40.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $58.70 | $38.44 | $97.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.02 | $27.98 | $74.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET ONLY | $18.78 | $5.02 | $23.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $26.91 | $11.88 | $38.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: VINYL FLOORING ONLY | $19.71 | $5.94 | $25.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $20.19 | $6.92 | $27.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $22.00 | $6.18 | $28.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.26 | $32.63 | $69.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $27.02 | $19.48 | $46.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $23.01 | $17.18 | $40.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (ASBESTOS ABATEMENT) | $27.47 | $19.89 | $47.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (CONCRETE WORKER; CONCRETE SAW) | $25.01 | $19.48 | $44.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $28.52 | $19.48 | $48.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $10.04 | $0.00 | $10.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $4.88 | $31.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $28.48 | $12.65 | $41.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.00 | $5.87 | $27.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.14 | $13.55 | $37.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $37.85 | $22.72 | $60.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $25.58 | $17.07 | $42.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $27.05 | $14.52 | $41.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $30.39 | $15.05 | $45.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $30.39 | $13.72 | $44.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $26.98 | $15.65 | $42.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER ONLY | $25.84 | $16.30 | $42.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $36.87 | $20.49 | $57.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $32.25 | $21.32 | $53.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $36.87 | $21.32 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.42 | $29.30 | $68.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (HOIST, FORKLIFT) | $41.88 | $30.03 | $71.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | $31.58 | $78.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, EXCLUDES WATERPROOFING | $16.76 | $3.90 | $20.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 | $85.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $28.96 | $78.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $21.86 | $10.35 | $32.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $24.95 | $13.91 | $38.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $19.77 | $5.02 | $24.79 | $0.00 | $0.00 | $0.00 | $0.00 |