Wage Determination PA20260091-14594-bld
Lackawanna, PA · building · Rev. 3 · Effective May 17, 2026
Quick Answer
Wage determination PA20260091-14594-bld covers 34 trade classifications for building construction in Lackawanna, PA. Total packages (base + fringe) range from $30.96/hr to $99.85/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260091-14594-bld
Revision: 3
Type: building
County: Lackawanna
State: PA
Effective: May 17, 2026
Trades covered: 34
Highest rate: $99.85/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.18 | $26.07 | $65.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $37.07 | $18.82 | $55.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.57 | $20.04 | $56.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $37.13 | $14.30 | $51.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $61.41 | $38.44 | $99.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $47.97 | $23.29 | $71.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $20.70 | $16.13 | $36.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $22.70 | $16.13 | $38.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $24.87 | $16.13 | $41.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (SCAFFOLD BUILDER).$ 23.47 16.13 LABORER | $23.37 | $16.13 | $39.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $37.07 | $18.82 | $55.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $33.01 | $18.37 | $51.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $51.69 | $27.07 | $78.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $51.69 | $27.07 | $78.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $28.36 | $18.10 | $46.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $39.42 | $29.30 | $68.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (CRANE, FORKLIFT) | $47.14 | $31.58 | $78.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (FORKLIFT) | $41.88 | $30.03 | $71.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR (FORKLIFT; CONCRETE PUMP) | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $40.74 | $29.70 | $70.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $34.25 | $21.89 | $56.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $30.26 | $80.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $32.62 | $15.62 | $48.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.13 | $16.52 | $51.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | $0.00 | $0.00 | $0.00 | $0.00 |