Wage Determination PA20260084-14593-bld
Columbia, PA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination PA20260084-14593-bld covers 34 trade classifications for building construction in Columbia, PA. Total packages (base + fringe) range from $30.96/hr to $99.85/hr, with the highest going to DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: PA20260084-14593-bld
Revision: 2
Type: building
County: Columbia
State: PA
Effective: May 17, 2026
Trades covered: 34
Highest rate: $99.85/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.18 | $26.07 | $65.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.84 | $20.19 | $57.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.66 | $21.32 | $53.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING | $61.41 | $38.44 | $99.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $23.41 | $11.19 | $34.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (CONCRETE WORKER; CONCRETE SAW) | $20.07 | $11.19 | $31.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER (FORKLIFT) | $24.91 | $11.19 | $36.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.02 | $16.88 | $37.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $32.66 | $21.58 | $54.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.73 | $15.10 | $45.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $33.01 | $18.37 | $51.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $27.95 | $16.12 | $44.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.36 | $29.45 | $70.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $28.36 | $18.10 | $46.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST, MECHANIC, LOADER, FORKLIFT | $44.61 | $30.83 | $75.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR CRANE | $47.14 | $31.58 | $78.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR HOIST, FORKLIFT | $41.88 | $30.03 | $71.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR OILER | $39.42 | $29.30 | $68.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR PUMP | $40.74 | $29.70 | $70.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $40.33 | $32.62 | $72.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.13 | $30.32 | $66.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.75 | $28.96 | $78.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $27.63 | $13.94 | $41.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.85 | $17.56 | $50.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | $0.00 | $0.00 | $0.00 | $0.00 |